During the renovation process, the floorspace of the library nearly doubled. As the roofline was changing, it was necessary to
remove part of the existing roof, and demolish exterior walls at both ends of the library.
The Library before construction work began. |  |
hidden
text
Laying the foundations for the new eastern end
of the building. |  |
hidden
text
The old teen area demolished, at the western end. | |
hidden
text
Ready to demolish the staff area.
|  |
 |  |
|  |